In 2023 we realized a fully electric drive for the Vögele 1800-3 for BAM.
The Vögele 1900 will be ready in mid-2024. The best practices of the NE-Paver 1800-3 have been incorporated into the design.
In 2022 we realized the complete electrification of the HAMM DV70 for BAM
The electrification of our first HAMM HX90 will be completed and delivered in the second quarter of 2024.
In mid-2023, we realized the complete electrification of the first Grader for our Norwegian partner Nullutslip. At the end of November we equipped a second Grader with a fully electric drivetrain for Drenth earthmoving.
We electrified this 9-ton excavator for our Norwegian partner Nullutslip AS.
We are currently realizing the system integration for 8 of these Terox A45 greenline articulated dumpers for our Norwegian partner Terox.
Want to know more about our machines? Please contact us directly